Sector:
Education
Client:
Oakbank School
Project value:
£2.7m
Form of contract:
Traditional BoQ
Duration:
8 months
Site location:
Keighley
The three phased construction projects included a new-build, steel-framed sports and assembly hall with brick exteriors and a metal roof. Two floors of classrooms were newly built and then linked into the existing building, and a music block was created from existing teaching facilities. The external landscaping included car parking.